Designed, supplied and installed prefabricated pre-painted fire mains piping to replace 40-year old headers originally welded in place, deteriorated by corrosion. Replaced old vertical turbine fire pumps with horizontal split-case units, supplied new pump controllers, header pressure controls and isolation valves, and transformer deluge valves. Safely removed and disposed of obsolete materials containing paint and asbestos gaskets. Organized and implemented mitigation measures to reduce fire risks and to minimize the duration of impairments during systems installation. Planned and scheduled the system replacements to minimize fire protection outages.

Inquiries

For further information on this or any project, please contact Jim Sawers

Project Highlights

CLIENT

BC Hydro

LOCATION

Hudson's Hope, BC

SCOPE

Designed, Supplied and install Prefabricated pre-painted fire mains piping.

DURATION

Ongoing